Decision Accelerator
-
Microsoft releases Sure Step 2012
A couple of days ago, at a Sure Step 2010 training at Sundsgården, Helsingborg, Sweden, while students were preparing to take the exam, one of the students asks me where she can download Sure Step 2010. I give her the link, but she tells me: “No, that’s Sure Step 2012, I’d like to download 2010” .
-
Requirements and Process Review – Critical vs. Non Critical
Requirements and process review is one of the decision accelerators in the Diagnostic phase of the Sure Step, aimed at gaining deeper understanding of customer’s business processes, and documenting high level requirements, as well as possible implementation issues.
-
The Sure Step Rule of Taxi Fare
Some time back, as I was riding a taxi from Prague airport to Holiday Inn hotel, I wondered about the fixed price I was about to pay for the ride. – “Airport to city is 700 flat.” – said the driver when I asked how much approximately will it cost. Common wisdom goes that flat rates mean you get it worse than if it wasn’t flat.
-
Diagnostic Phase – a signpost for implementation
Each phase of Microsoft Dynamics Sure Step methodology is equally important in an implementation project. You could argue that analysis is the most important, or that design is the most important, or that operation is less important. I’ll paraphrase Scott Adams here and ask: how one phase can be more important if each of them is completely necessary?
-
A case for Sure Step: how Sure Step brings project success
Methodology is a tough topic. There are good methodologies, there are bad methodologies, there are good methodologies gone bad. Methodology is not a silver bullet, it won’t just make any problems disappear, and is hardly ever the single source of success or failure. But a methodology can be a major contributor to success.